A lift is only as good as its installation. The best machine will jerk, stop unevenly or break down often if the rails are out of line or the shaft was built to the wrong size. Our lift installation in Aurangabad, Bihar is built around careful preparation and inspection at every stage, so the lift you get on handover day is the lift you paid for.
Eldeal Engineers has no office in Aurangabad district. Installations here are planned and carried out by our corporate office team from Sasaram, which is linked to Aurangabad by the G.T. Road. We handle homes, clinics, shops, hotels, marriage halls and apartment blocks.
Lift installation in Aurangabad, Bihar: who does what
Most delays on lift projects come from confusion over responsibilities. The owner thinks the lift company will build the pit; the lift company thinks the contractor has done it. We put this in writing before work begins. The table below shows the usual split.
| Item | Building owner / contractor | Eldeal Engineers |
|---|---|---|
| Shaft, pit and headroom | Builds to our drawing | Provides drawing and checks measurements |
| Door openings on each floor | Leaves openings at marked size | Fixes frames, doors and finishing |
| Power supply | Arranges connection and main switch | Specifies the load and does lift wiring |
| Machine room (if any) | Builds room with ventilation and hook | Mounts machine and controller |
| Lift equipment | — | Supplies, installs, tests and hands over |
Site-readiness checklist before we arrive
Use this list once your civil contractor says the shaft is ready. It will save you a wasted visit.
- The shaft is plumb and its inside size matches the drawing on every floor.
- The pit is at the agreed depth, waterproofed and dry. Standing water in the pit must be sorted first.
- Headroom above the top floor is at the height given in the drawing.
- All shuttering, bamboo and loose material is removed from the shaft.
- A lockable space is available on site to store lift material safely.
- A temporary power point is available for our tools.
Common mistakes that delay a lift project
On lift projects across Bihar, the same few problems come up again and again. Each one is easy to avoid if you know about it early.
- Building the shaft before choosing the lift. A shaft that is a few centimetres too narrow can rule out the car size you wanted.
- Forgetting the pit. Some buildings finish the ground floor slab with no pit at all, which then has to be broken out.
- Leaving the power connection to the end. The lift is ready but cannot be tested or used.
- Changing the floor finish level later. Thick tiles or marble added after installation leave a step at the lift door.
Choosing the right type before installation
The installation method depends on the lift you choose, so this decision comes first. For most Aurangabad buildings the choice is between a machine-room-less (MRL) traction lift, a traction lift with a machine room, and a hydraulic lift. MRL saves a room on the roof. A machine room gives easier access for heavy-duty use. Hydraulic suits low-rise buildings and heavy goods. Our article on MRL vs machine room elevators explains the trade-offs.
For houses, a compact home lift may need a smaller pit and less headroom. For clinics, the car must be deep enough for a stretcher. We decide these points at the survey, before a single rail is ordered.
How the installation runs, stage by stage
- Free site survey: our Sasaram team measures the building, notes access for material and discusses how you will use the lift.
- Design and quotation: you receive a layout drawing and an itemised quote with the scope split shown above.
- Pre-installation check: we confirm the civil work against the drawing.
- Supply: design-tested equipment is delivered to site and checked against the order.
- Mechanical work: guide rails, car frame, counterweight and doors are fixed and aligned. Each step is inspected before the next begins.
- Electrical work: controller, V3F drive, wiring and safety circuits are connected.
- Testing: we test levelling, door protection, overload sensor, alarm, intercom, emergency light and the automatic rescue device (ARD) with power cut off.
- Handover: you get a demonstration, documents and the support number, and the lift moves into maintenance.
More detail on each step is on our lift installation service page.
Safety standards for new lifts in Bihar
From 22 December 2025, BIS made IS 17900 mandatory for new lift installations in India. The standard is aligned with European lift safety codes and asks for protection against unintended car movement, protection against the car overspeeding upwards, and rescue arrangements such as ARD. In addition, the Bihar Lift and Escalator Bill, 2024 introduces registration, inspection, mandatory maintenance and third-party insurance.
Because notifications and forms can change, check the current requirements with the local authority in Aurangabad before your building plan is final. We give you the lift-side technical documents you need.
What affects the installation cost
We do not quote a lift price over the phone because the right figure depends on your building. The main drivers are the number of floors, load capacity, speed, whether you need a machine room, door type (manual, automatic, centre-opening or telescopic), car finish, and how much preparatory work the site needs. Ask every supplier whether transport of material to Aurangabad is included or charged extra. Our quote lists every item separately, so you can compare fairly with any other offer.
After installation
A new lift needs regular care from the first month. The same Sasaram team that installed it carries out preventive maintenance under an AMC, with 24/7 support for breakdowns. If you would like to know more about us before you decide, read about our lift company services in Aurangabad.
Ready to plan an elevator installation in Aurangabad? Book a free site survey and get an itemised quote. Call or WhatsApp +91 84489 44342 or +91 62077 91650.